GFA: 26,000 ㎡
Time of Design: 2024
Time of Completion: Estimated in 2027
Design Phases: Architectural Schematic Design, Construction Drawings (including architectural design, interior design, landscape design, etc.)
Awards: Competition winner
Co-designer: CIEDC