EN 中文
GFA: 48,400 m2
Time of Design: 2023
Time of Completion: Estimated in 2026
Design Phase: Architectural Schematic Design, Construction Drawings (including architectural design,interior design,landscape design,etc)
Co-designer: CIEDC ( Shenzhen)