GFA: 32,000 ㎡
Time of Design: 2021-2022
Time of Completion: Estimated in 2026
Design Phases: Architectural Schematic Design, Construction Drawings (including architectural design, interior design, landscape design, etc.)
Co-designer: CIEDC, Henan Zhaoyang Architecture Design Co. Ltd.
Awards: Competition winner