SHENZHEN BAISHILONG CULTURAL CENTER

GFA: 20,000 ㎡ 

Time of Design: 2022

Time of Completion: Estimated in 2026

Design Phase: Architectural Schematic Design, Construction Drawings

Awards: Competition winner


MEDIA COVERAGE -

Position

中标实施方案|深圳白石龙文化中心 / 墨泰建筑

GUANZHU

中标实施方案 | 造筑为园——深圳白石龙文化中心 / 墨泰建筑

AT

【AT】墨泰新作 | 造筑为园——深圳白石龙文化中心(中标实施方案)


1.jpg

Design idea

We hope that the design of this project would serve as an example of shared interaction between public buildings and the urban environment. Being surrounded by high-density and blocked urban villages, the site is almost an urban dead zone at the moment.The boundaries between the site and the urban villages are broken, so paths to reach the urban villages are built. A well-connected pocket park is created on the site.The ground floor of the new building is completely elevated. The radial pattern of cross shear walls maximizes the openness of the building in all directions. The site turns into a meeting place of pedestrian walkways in the neighborhoods and an outdoor activity space for the surrounding residents. The local people’s life and the cultural architecture generate the vitality of the site.The building is compactly designed as a cube, wherein a three-dimensional path for wandering linking all the floors. A series of distinctive spaces along this path could be seen partially through the façades. With rich expression on the facades, a futuristic building would grow out of the vital  urban village.



CONTACT US

Phone: 0755-86264658
Fax: 0755-86264613
E-mail: MT@mtarch.cn
Address : 5th  Floor, Block B2, North of OCT LOFT, Nanshan District, Shenzhen