GFA: 96,000 ㎡
Time of Design: 2016
Time of Completion: 2022
Design Phases: Architectural Schematic Design, Construction Drawings
Awards: 2023 1st Prize in the Beijing Excellent Engineering Survey and Design Awards
2023 3nd Prize in the Shenzhen Excellent Engineering Survey and Design Awards
2019 Golden Prize in the 5th Shenzhen Architectural Design Awards (Scheme)