GFA: 141,000 ㎡
Time of Design: 2008
Time of Completion: 2017
Design Phase: Architectural Schematic Design, Construction Drawings (including architectural design, landscape design, etc.)
Co-designer: Xu Jinrong Studio, Tsinghua-Yuan Architecture And Planning Design And Research Ltd. Shenzhen