GFA: 515,000 ㎡
Time of Design: 2021-2022
Time of Completion: Estimated in 2025
Design Phase: Architectural Schematic Design, Construction Drawings (including architectural design, interior design, landscape design, etc.)
Co-designer: CIEDC
Awards: Competition winner